Trans Baling

TRAVERSE · KEDAH

Trans Baling

HARD

Razor-sharp limestone karst ridge traverse in Kedah requiring technical rope work and careful footing.

1 peak
Peaks
10 km
Distance
950 m
Elevation gain
1 day
Duration

About this traverse

Trans Baling is a multi-peak traverse in Kedah, Malaysia. The route links 1 summit over approximately 10 km. Total elevation gain is 950 m. The typical completion time is 1+ days. The traverse is rated hard.

Peaks

1
Gunung Baling
546 mKedahModerate
No permitNo guide needed

Best season

Mar–Oct

Frequently asked questions

How many peaks are on the Trans Baling?

Trans Baling links 1 peak: Gunung Baling.

How long is the Trans Baling?

The Trans Baling is 10 km long with 950 m of elevation gain.

How many days does the Trans Baling take?

Most parties complete the Trans Baling in at least 1 day.

How difficult is the Trans Baling?

The Trans Baling is rated hard. The route covers 10 km with 950 m of ascent.

Do I need a permit for the Trans Baling?

No permit is required for the Trans Baling.

Do I need a guide for the Trans Baling?

A guide is optional for the Trans Baling.

When is the best time to do the Trans Baling?

Mar–Oct

Log your traverse in Pacak
Track every summit, collect badges, and share your story.
Coming soon on
App Store
Coming soon on
Google Play