TRAVERSE · KEDAH
Razor-sharp limestone karst ridge traverse in Kedah requiring technical rope work and careful footing.
Trans Baling is a multi-peak traverse in Kedah, Malaysia. The route links 1 summit over approximately 10 km. Total elevation gain is 950 m. The typical completion time is 1+ days. The traverse is rated hard.
Mar–Oct
Trans Baling links 1 peak: Gunung Baling.
The Trans Baling is 10 km long with 950 m of elevation gain.
Most parties complete the Trans Baling in at least 1 day.
The Trans Baling is rated hard. The route covers 10 km with 950 m of ascent.
No permit is required for the Trans Baling.
A guide is optional for the Trans Baling.
Mar–Oct