Trans Guling

TRAVERSE · SELANGOR

Trans Guling

HARD

Intense, lesser-known technical ridge trail climbing tight spurs right along the Selangor-Pahang border line.

2 peaks
Peaks
12 km
Distance
950 m
Elevation gain
1 day
Duration

About this traverse

Trans Guling is a multi-peak traverse in Selangor, Malaysia. The route links 2 summits over approximately 12 km. Total elevation gain is 950 m. The typical completion time is 1+ days. The traverse is rated hard.

Peaks

1
Gunung Guling
1,340 mSelangorHard
2
Gunung Gantang
1,300 mSelangorHard
No permitNo guide needed

Best season

Apr–Sep

Frequently asked questions

How many peaks are on the Trans Guling?

Trans Guling links 2 peaks: Gunung Guling, Gunung Gantang.

How long is the Trans Guling?

The Trans Guling is 12 km long with 950 m of elevation gain.

How many days does the Trans Guling take?

Most parties complete the Trans Guling in at least 1 day.

How difficult is the Trans Guling?

The Trans Guling is rated hard. The route covers 12 km with 950 m of ascent.

Do I need a permit for the Trans Guling?

No permit is required for the Trans Guling.

Do I need a guide for the Trans Guling?

A guide is optional for the Trans Guling.

When is the best time to do the Trans Guling?

Apr–Sep

Log your traverse in Pacak
Track every summit, collect badges, and share your story.
Coming soon on
App Store
Coming soon on
Google Play