Trans CBR

TRAVERSE · JOHOR

Trans CBR

HARD

Southern Peninsular classic. Technical rocky ridge paths connecting the primary peaks of central Johor.

3 peaks
Peaks
24 km
Distance
1,600 m
Elevation gain
3 days
Duration

About this traverse

Trans CBR is a multi-peak traverse in Johor, Malaysia. The route links 3 summits over approximately 24 km. Total elevation gain is 1,600 m. The typical completion time is 3+ days. The traverse is rated hard.

Peaks

1
Gunung Chemendong
846 mJohorModerate
2
Gunung Belumut
1,010 mJohorModerate
3
Gunung Gua Rimau
889 mJohorModerate
No permitNo guide needed

Best season

Apr–Sep

Frequently asked questions

How many peaks are on the Trans CBR?

Trans CBR links 3 peaks: Gunung Chemendong, Gunung Belumut, Gunung Gua Rimau.

How long is the Trans CBR?

The Trans CBR is 24 km long with 1,600 m of elevation gain.

How many days does the Trans CBR take?

Most parties complete the Trans CBR in at least 3 days.

How difficult is the Trans CBR?

The Trans CBR is rated hard. The route covers 24 km with 1,600 m of ascent.

Do I need a permit for the Trans CBR?

No permit is required for the Trans CBR.

Do I need a guide for the Trans CBR?

A guide is optional for the Trans CBR.

When is the best time to do the Trans CBR?

Apr–Sep

Log your traverse in Pacak
Track every summit, collect badges, and share your story.
Coming soon on
App Store
Coming soon on
Google Play